A Legal–Economic Analysis of Sanctions for Reducing the Risk of Opportunistic Behaviour and Facilitating Compensation in EPC Contracts
Keywords:
Sanctions, opportunistic, behavior risk, theory of independence of effects, astreinte, disgorgement of profits from breach of contractAbstract
Engineering, Procurement, and Construction (EPC) contracts in the construction industry involve distinctive and multifaceted conditions due to the enormous volume of investment, lengthy implementation periods, and integration of complex technologies. Preserving the economic equilibrium and ensuring the continued performance of these megaprojects require moving beyond the binary approaches of traditional law and adopting progressive and flexible doctrines. Drawing on the theory of independence of effects and emphasizing the need for severability and gradation, this article explains contractual Sanctions in proportion to the severity of the breach of obligations. Within this analytical framework, the application of localized responses to contractual breaches ensures the preservation of the contractual relationship as a whole and demonstrates substantial convergence with the principle of the contractor’s single-point responsibility. The examination of transaction cost economics and incomplete contract theory provides a basis for accurately identifying opportunistic behavior following contract formation. Hold-up and holdout phenomena exploit the parties’ mutual dependence and relationship-specific investments, thereby disrupting the efficient allocation of resources. Clarifying obligations, allocating risks intelligently, and adhering to the principle of good faith provide effective mechanisms for restricting such destructive conduct. Furthermore, the application of the astreinte doctrine and coercive civil penalties provides a powerful mechanism, independent of actual damages, for compelling obligors to perform non-monetary obligations precisely. The doctrine of disgorgement of profits derived from breach of contract also neutralizes the financial incentives for breach by shifting the analytical focus from the injured party’s loss to the breaching party’s gain. Incorporating these modern legal mechanisms into the Iranian legal system requires the development of legal concepts concerning full compensation and the redefinition of traditional rules of civil liability. The principal contribution of this study is the formulation of a comprehensive framework for risk management, the facilitation of dispute resolution, and the enhancement of economic efficiency in major national contracts.
References
Badini, H., Taghizadeh, E., Alidousti Shahraki, N., & Panahi Asanlou, P. (2016). The effect of the full-compensation principle on concrete and abstract methods of assessing damages in the international sale of goods. Comparative Law Research, 20(1).
Bagheri, M. (2009). The economics of contract law (1st ed.). University of Tehran Press.
Birmingham, R. (1970). Breach of contract, damage measures, and economic efficiency. Rutgers Law Review, 24.
Carbonnier, J. (2000). Droit civil, Volume 4: Les obligations (22nd ed., Vol. 4). Presses Universitaires de France.
Cooter, R., & Ulen, T. (2016). Law and economics (6th ed.). Berkeley Law.
Cruces, J. J., & Trebesch, C. (2013). Sovereign defaults: The price of delay. American Economic Journal: Macroeconomics, 5(3).
Dadgar, Y. (2010). Foundations and channels of law and economics (2nd ed.). Institute for Economic Research, Tarbiat Modares University.
Eisenberg, M. A. (2006). The disgorgement interest in contract law. Michigan Law Review, 105.
Eslamipanah, A., & Alaei, A. (2022). The right of termination in partial invalidity of contract in Imamiyah jurisprudence, the Iranian legal system, and common law. International Legal Research, 15(55).
Ghasemi Hamed, A. (2007). Reference concerning jurisprudential rules and compensation for damages.
Isaee Tafreshi, M., Shahmohammadi, M., & Sadeghi, M. (2012). Restitution of profits obtained by the breaching party as a measure for compensating damages arising from infringement of intellectual property rights. Comparative Law Research, 16(1).
Isaee Tafreshi, M., & Soltani, M. (2011). A legal-economic analysis of efficient breach of contract. Private Law Research Quarterly, 1(1).
Karimi, M., Kashani, J., & Arab Ahmadi, M. R. (2021). An analysis of the role of good faith in preventing opportunistic behavior in contract law. Biannual Scientific Journal of Civil Law Knowledge, 10(2).
Katouzian, N. (2001). General rules of contracts (Vol. 3). Enteshar Joint-Stock Company.
Katouzian, N. (2009). General rules of contracts: Dissolution of contracts (5th ed., Vol. 5). Enteshar Joint-Stock Company.
Katouzian, N. (2013). General rules of contracts: Performance of contract (6th ed., Vol. 4). Enteshar Joint-Stock Company.
Khadem Sarbakhsh, A., & Soltaninejad, H. (2013). Reference to full-compensation discussions in research related to loss of profit.
McKendrick, E. (2019). Contract law: Text, cases, and materials (8th ed.). Oxford University Press.
Menetrez, F. (2000). Consequentialism, promissory obligation, and the theory of efficient breach. UCLA Law Review, 47(3).
Miceli, T. J., & Segerson, K. (2007). A bargaining model of holdouts and eminent domain. International Review of Law and Economics, 27(1).
Mirshakari, A., & Abdi, M. (2023). Distinguishing loss of profit from deprivation of benefit: With emphasis on critique and analysis of judgments of Branch 20 of the Tehran General Civil Court and Branch 80 of the Tehran Province Court of Appeal. Biannual Journal of Critique and Analysis of Judicial Decisions, 2(3).
Morgan, J. (2013). Contract law minimalism: A formalist restatement of commercial law. Cambridge University Press.
Naeimi, H. (2014). Recoverable damages in contractual liability under Iranian, English, and United States law Shahid Beheshti University]. Tehran, Iran.
Najafi, M. H. (1988). Jawahir al-Kalam (Vol. 37). Dar Ihya al-Turath al-Arabi.
Nicholas, B. (1992). The French law of contract (2nd ed.). Clarendon Press.
Norouzi, M. (2015). A legal and economic analysis of engineering, procurement, and construction contracts Faculty of Law and Political Science, University of Tehran].
Norouzi, M., Ghanavati, J., & Seyedahmadi Sajjadi, S. A. (2018). A legal-economic analysis of engineering, procurement, and construction contracts with a jurisprudential approach. Research in Islamic Jurisprudence and Law, 15(54).
Rajabi, A. (2025). The nature of contract from a legal perspective: A reflection on the autonomy of contract law. Private Law Studies Quarterly, 55(4).
Roberts, C. (2008). Restitutionary disgorgement for opportunistic breach of contract and mitigation of damages. Loyola of Los Angeles Law Review, 42.
Roberts, C. (2016). Supreme disgorgement. Florida Law Review, 68(5).
Shaarian, E., & Sahebjam, L. (2019). Standards of proving damages and determining their amount: A comparative study of transnational instruments and international arbitral awards. Public Law Research(65).
Shams, A. (2015). Civil procedure: Advanced course (29th ed., Vol. 2). Derak Publications.
Shiravi, A. (2014). International trade law (7th ed.). SAMT Publications.
Tabatabaei Hesari, N., & Khanarinejad, A. (2024). Conceptual interaction and mutual influence of incomplete-contract and transaction-cost economic theories with the secondary real-estate registration system. Legal Research Quarterly, 27(2).
Treitel, G. H. (2015). The law of contract (14th ed.). Sweet & Maxwell.
Watterson, S. (2015). Gain-based Sanctions for civil wrongs in England and Wales. In Disgorgement of Profits: Gain-Based Sanctions throughout the World.
Weinrib, E. (2003). Punishment and disgorgement as contract Sanctions. Chicago-Kent Law Review, 78.
Williamson, O. E. (1985). The economic institutions of capitalism: Firms, markets, relational contracting. Free Press.
Downloads
Publication Timeline
- Submitted
- Revised
- Accepted
Issue
Section
License
Copyright (c) 2025 Ali Mohry (Author); Ali Eslamipanah (Corresponding author)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.